Hot Tub

Procedure For Installing A Hot Tub Or Above Ground Pool

  1. Requires a development permit
  2. If the hot tub/pool is hard wired, an electrical permit is required
  3. The hot tub must be at least three feet from the house
  4. A fence at least four feet in height must be erected around the hot tub with a self-closing, self-latching gate if the water is greater than 24 inches in depth
  5. The hot tub/pool must conform to the setback requirements of the underlying zoning
  6. A plumbing permit is required only if the hot tub/pool is hard plumbed to the house system

Copyright © City of Troutdale
City of Troutdale- Last Updated April 14, 2006