
Sign Requirements
The Planning Staff must sign off on all sign requests prior to building and/or electrical permits being issued.
- Requires a Tri-County checklist.
- Building permit required.
- The fee is based on the valuation of the sign.
- Submit two sets of drawings.
- Requires a Tri-County checklist.
- A building permit is required for permanently installed signs.
- The fee is based on the valuation of the sign.
- Submit two sets of design drawings.
- An electrical permit is required for illuminated signs.
- The fee is $90 plus the state surcharge.
- Additional fee required for circuits or feeders.
Copyright © City of Troutdale
City of Troutdale- Last Updated
November 14, 2006
|